top of page

CONTRACT FOR RENTING A WASTE CONTAINER

THE PROHIBITED MATERIALS IN YOUR CONTAINER ARE INDICATED BELOW BY CONTAINER SIZE.

1. (10, 15 and 20 yards, option 1)

  • Soil

  • Rock

  • Cement

  • Mattress

  • Box spring

  • Tires

  • Food

  • Asbestos

  • Chemicals (paint, oil, gasoline, etc.)

2. (20 yards option 2 for concrete, soil or asphalt)

No other materials are accepted.

3. (30 and 40 yards)

  • Mattress

  • Box spring

  • Tires

  • Chemicals (paint, oil, gasoline, etc.)

  • Asbestos

  • Food

4. (Container for shingle paper any size)

Accepted materials only:

  • Shingles

  • Nails

  • Black paper

  • Some scraps of plywood

  • Maximum vent

  • Shingle package envelope

  • Wood pallets

  • Starting flashing

  • Fascia and soffit

5. Any materials not accepted in your containers will add a $100 surcharge.

6. (Maximum load container 10, 15 and 20 yards option 1)

The maximum load for this type of container is 3000 kg. However, an additional fee will still be added if you exceed the tonnage included in your price. Location Godmaire reserves the right to dump on the site any load that exceeds the maximum of 3000 kg.

7. (Maximum load container 30, 40 and 20 yards option 2)

The maximum load for this type of container is 10000 kg or 6000 kg during thawing period.

However, an additional fee will still be added if you exceed the tonnage included in your price.

Location Godmaire reserves the right to dump on the site any load that exceeds the maximum of 10000 kg or 6000 kg during thawing period.

***Non-liability***

8. The customer is responsible for excess weight, dangerous loading, theft, damage to the container as well as the materials not accepted. No loading should be higher than the container. In the event of non-compliance with this height, Location Godmaire may dispose of the surplus debris or materials not accepted on the site itself and without warning. We do not assume any responsibility for damage to the pavement and/or ground. Furthermore, you are responsible for the container until we retrieve it. All damages noticed on the container during your rental will be repaired and added to your invoice.

9. The customer agrees to pay Location Godmaire for any service, excess tonnage, surcharge or damage to the equipment upon receipt of the invoice.

10. An interest of 24% per year or 2% per month will be added to the unpaid balance.

11. If Location Godmaire has to resort to collection services to collect or recover any unpaid amount, then the tenant agrees to pay, in addition to the principal, the interest incurred and the legal fees incurred, an amount equivalent to 25% of the amount due in principal and this, as liquidated damages to compensate the landlord's obligation to resort to this legal means of constraint.

bottom of page